Power Projects

  • Construction of Substation.
  • Laying of underground Cables.
  • Installation and Replacement of Meters.
  • Laying of Aerial Bundle Conductors along with accessories.
  • All Electrificaton Work.
    Currently Running Projects:
    1. Electrification and Utility related works for Uttar Pradesh Metro Rail Corporation Ltd. Under Gulermak -Sam India JV for Kanpur Metro which is accredited with the title of being the fastest metro construction in India
    2. Electrification Work in a State of Bihar under the Discom of NBPDCL (Motihari) and SBPDCL (Sasaram).
    3. Alot of private Sub-station have been made by us for many National and International Companies.
Over the years electrification and substations built:
  1. Replacement of Mechanical Meter with Electronic meter 4.5 Lakhs in nos. (Single Phase and Three Phase meter) in the year of 2002-2004 in a various Cities of Uttar Pradesh namely Agra, Meerut, Saharanpur, Allahabad, Varanasi.
  2. Developing Infrastructure complete and laying of Aerial Bundle Conductor alongwith all accessories with installations of meters in Varanasi and Jaunpur approx. 550 KM. The Existing overhead line were duly removed in the of Year of 2009-2010.
  3. Construction of 33/11 KV Sub-Station (2x5 MVA) 04 in Nos. in District Hardoi under MVVNL, Lucknow.
    • Bilgram
    • Sandila
    • Shahabad
    • Mahmudabad
  4. Construction of 33/11 KV Sub-Station under the Business Plan 02 in Nos. under the DVVNL, Agra in the year 2015-16.
    • Baripal
    • Meethepur
  5. Construction of 33 KV Double Circuit Line from 132 KV Sub Station Sikandara, Kanpur Dehat to Umrahat (Pump canal) approx. 26 KM in the year 2015-16 under DVVNL, Agra.
  6. Electrification Work in the District of Etawah under the Scheme of Integrated Power Development Scheme 04 in nos. Town Bakewar, Ekdil, Jaswant Nagar and Lakhana in the year of 2016-2019 under DVVNL, Agra.
  7. Electrification work in the District of Kanpur Nagar under the Scheme of Deen Dayal Upadhaya Gram Jyoti Yojana in the year of 2016-2020 under DVVNL, Agra.
  8. Construction of 33/11 KV Sub-station 04 in Nos. under DVVNL, Agra. The Scheme being Deen Dayal Upadhaya Gram Jyoti Yojana in District Kanpur Nagar and Kanpur Dehat in the year of 2016-2018.
    • Tikra
    • Rania
    • Gujela
    • Bhadras
  9. Construction of 33/11 KV Sub-station 03 in nos. under DVVNL, Agra. The Scheme being Integrated Power Development Scheme in District Firozabad and Etawah in the year of 2016-2018.
    • Bakewar (Etawah)
    • Ramnagar (Firozabad)
    • Sirsaganj (Firozabad)
  10. LT Underground Cable laying (150 KM), Installation of Type A, B and C panels work in a Kesco, Kanpur in the year of 2018-2021.